  Project 0:
     Program Administration
  
  Project 1.1:
     Program Planning and
     Analysis Project
  
  Project 2.1:
     Enhanced Landfill
     Gas Production Using
     Bioreactors Project
  
  Project 2.2:
     Enhanced Energy
     Recovery through
     Optimization of
     Anaerobic Digestion
     and Microturbines
  
  Project 3.1:
     Dairy Waste to
     Energy Project
  
  Project 3.2:
     Building Integrated
     PV Testing and
     Evaluation Project
  
  Project 3.3:
     Building Integrated
     Photovoltaics on
     Public Facilities
     Project
  
  Program Schedule
  
  Monthly Status Reports
    2002 reports
  
    2003 reports   
    2004 reports   
    2005 reports
  
  Upcoming Events
  
  Photo Gallery
  
  Private Access Page

Project 3.1: Dairy Waste to Energy Project
Project Manager - CH2M Hill

Project Overview

Goals and Objectives

The goals of Dairy Waste to Energy project are to:

  • Develop technologies that can be used to maximize the energy recovery from animal waste
  • Develop and evaluate different pilot projects that will include facilities at existing treatment plants and at individual and clusters of dairies
  • Evaluate and test the effectiveness of low and high technologies developed in North America and Europe for the collection processing and energy recovery of animal waste

The objectives of the project are to:

  • Assess and evaluate technologies available for the conversion of animal waste to energy including:
  • Select Sites for animal waste to energy pilot plant(s)
  • Design, construct and operate pilot plant(s)
  • Summarize and evaluate economic and environmental costs and benefits associated with developing an animal waste to energy facilities.

Projected Outcomes

The Dairy Waste to Energy Project will generate the following specific work products: Process flow diagrams (which integrate the selected process advancements into the selected site) and preliminary facilities location plans depicting the conceptual layout of the pilot plant, the pilot plant test protocol Plan, performance specifications, site drawings, and one (or more) operating pilot plant(s) ranging in size from 60 kW to 5 MWs, with quarterly plant operating reports that document performance and needed modifications throughout the project.

Top

Publications, Reports and Other Deliverables for Project 3.1: Dairy Waste to Energy Project

List of Publications, Reports and Other Deliverables

Project 3.1 Monthly Status Reports
NIRAS Presentation (Powerpoint, 22 MB)

NOTE:  All finalized deliverables are available in Adobe Acrobat PDF format. To obtain a free copy of Adobe® Acrobat® Reader®, please click here.

Task 3.1.1:   Assess, Evaluate, and Select Animal Waste to Energy Technology

Task 3.1.2:   Site Selection

Task 3.1.3:   Prepare Pilot Plant Final Design and Dairy Waste to Energy Project Test Plan

  • 3.1.3c(1): Pilot Plant(s) Design Memorandum
  • 3.1.3c(2): Draft Dairy Waste to Energy Test Plan
  • 3.1.3c(3): Final Dairy Waste to Energy Test Plan

Task 3.1.4:   Construct Pilot Plant(s)

Task 3.1.5:   Operate and Test Pilot Plant(s)

Task 3.1.6:   Conduct Economic and Environmental Assessment

Task 3.1.7:   Prepare Final Report for Project 3.1

Task 3.1.8:   Coordinate with Renewables Project Advisory Committee

Task 3.1.9:   Perform Detailed Distribution Interconnection Study

Task 3.1.10:   Dynamic Study of Three BI-PV and Biogas High Penetration Scenarios

Task 3.1.11:   Evaluate Project


Top